
Add to Cart
Best Price Automatic Fuel Feeding Industrial Biomass Steam Boiler For Sale
Brief intrduction:
The SZL(D) type biomass steam boiler is low pressure horizontal double-drum water tube boiler, designed with cyclone combustion chamber and water-cooled arch. Its furnace and grate are designed according to biomass fuel features, have high heat effciency for various biomass fuel such as wood, wood chip, rice husk hull, sawdust biomass pellet, bagasse, coconut shell, palm kernel shell etc.
Quick Details:
Steam Capacity | 1 to 35 ton/hr |
Fuel Applicable | coal, biomass, bituminous, anthracite, rice husk, bagasse, palm kernel shell |
Working pressure | 0.4-2.5Mpa 4bar-25bar |
Steam temperature | 184℃, 194℃, 204℃, 226℃ |
Grate | Chain grate |
Structure | water tube, membrane wall |
Heat efficiency | >83% |
Fuel feeding | Automatic |
Application | various industrial production |
SZL biomass steam boiler design features:
1. Water tube with two tanks, Designed with cyclone 2nd-burning chamber inside the furnace
To make sure fuel sufficient combustion, also acheive saving energy and environmental protection.
2. Higher and bigger furnace size in "D" or “A” Type layout
Achieve higher efficiency on fuel combustion such as coal, biomass. especially for biomass fuels, like pellet, rice husk, sawdust, nutshell, wood and so on.
3. Pressure up within 3-5min
It's water tube boiler with double tanks, achieve fast pressure up and great circulating of water inside, avoid sediment inside tubes from water protect boiler longer life span.
4. 0%-110% steam load range
We design with 10% bigger size than standard to ensure steam load from different calories fuel.
5. Bigger size chain grate achieve better combustion
We use the best quality fire grate, and the grate can make the fuel firing sufficiently, greatly save fuel.
6. Water cooled furnace arch
The furnace arch is designed with a line of water tubes inside for supporting, avoid arch collapse.
Boiler system: we provide this biomass steam boiler with full set auxiliaries.
Number | Item | Brand | Number | Item | Brand |
1 | Boiler proper | Yuanda | 8 | Induced fan | |
2 | Fuel feeder | 9 | Steam header | ||
3 | Electric control box | Yuanda | 10 | Feed water pump | |
4 | Economizer | Yuanda | 11 | Deaerator | Yuanda |
5 | Water treatment | Fleck | 12 | chimney | Yuanda |
6 | Water tank | 13 | Slag remover | ||
7 | Forced fan | 14 | Instrument&valves | ||
8 | Grate speed reducer | 15 | Cyclone Dust Collector |
After-sale service:
1. provide full range of original spare parts.
2. We will send engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.
FAQ
Q1: How can you get the best price quickly?
(1) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model. (2) Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient
for our communication.
Q2: Why should you believe our boiler quality?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection(welding seam): ensure the quality of entire boiler;
(4).Hydrostatic test: ensure the standard working pressure and safety;
(5).Third-party inspection report:By Henan Boiler Inspection Institute;
(6).Passed ISO:9001 and SGS certificate.
Q3: What about the installation and Commissioning?
After you receive the boiler, we will guide you to make some preparation for installation;If necessary, our expert will fly to your local place in 72 hours. The experts will responsible for guiding installation and commissioning.
But the buyer will be in charge of :
(1) The round air-tickets costs from Zhengzhou city to your project site.
(2) Board and lodging of seller's workers for entire period at the end user's site.
(3) Service fee for guiding engineer:100$/day/person.
Q4:What is the using life of your boiler?
A:Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,the boiler can be used for 20-25 years.